FDOT District Two selected the KCA Team for the SR 20 from Alachua County Line to SW 56th Avenue project!
This project involves widening SR 20 from a rural two-lane undivided roadway to an urban four-lane divided roadway from the Alachua County Line to SW 56th Avenue in Putnam County, which will increase capacity, improve overall safety, and connect additional widening projects to facilitate east/west movements across the state. Additionally, KCA will design bike lanes, 5-foot sidewalks, and a 10-foot-wide multi-use path along the south side of SR 20. Our team will also provide dual bridges, 300 feet in length, at Fowler’s Prairie.
The KCA team will provide roadway and structures design, drainage/permitting, S&PM/traffic/signals, surveying, and right-of-way mapping/SUE services.
Congrats to the entire project team including Kevin Tasillo, PE, PTOE, Project Manager (his first win as Project Manager); Roger Rossitto, PE; John Burton, PE, PTOE; Tara Spieler, PE; David Thompson, PE; Fathy Abdalla, Ph.D., PE, PTOE; Victor Gallo, PE; Jonathan Langston, EI; Tony Filippello; and several others from KCA departments. A big thanks to all that helped with the preparation of this proposal and the marketing efforts that contributed to this win!
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.