KCA is providing CEI services for operational Improvements to the existing I-10/I-95 Interchange. This project includes widening the Fuller Warren Bridge to create three additional lanes for traffic along I-95, along with a shared-use path over the St. Johns River adjacent to the Fuller Warren Bridge. Bridge widening entails marine construction of drilled shaft foundations, waterline footers, columns, and caps. The main span includes a post tensioned spliced girder system. The project includes roadway reconstruction and widening of I-95 and I-10 interchange, bridge ramp construction and widening, construction of noise walls, ITS, signalization, overhead signage, and pavement markings. This project also includes improvements to local side streets with aesthetic features.
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.