KCA re-evaluated the PD&E Study for this project to reconstruct 2.4 miles of existing two-lane rural roadway to a four-lane road with sidewalks and flush inside shoulders with curb. Stormwater management for water quality (treatment) and water quantity (attenuation) were provided for the ultimate six-lane section, through the use of wet detention stormwater management facilities.
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.