This project consists of a multi-phase interchange with new construction involving 17 bridge structures including 78-inch bulb tees, curved long-span steel beams, integral post-tensioned piers for multi-lane multi-level construction, AASHTO beam construction, bridge demolition, bridge widening, and bridge and roadway slabs with diamond grinding. Project also encompasses first floor renovation of the FDOT District Two Urban Office (9,927 square feet). Cost: $150 million
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.