KCA designed this 9.3-mile interstate project, which included the widening of the existing four-lane I-75 roadway to an interim six-lane section with provisions for the ultimate eight-lane typical. The interim widening was constructed toward the median with all stormwater facilities located within the existing right-of-way. This project also included numerous wetlands, threatened and endangered species, and the widening of the Deer Prairie Creek bridges. Permitting included coordination with the Southwest Florida Water Management District and U.S. Army Corps of Engineers.