KCA is the lead firm for NCDOT construction inspection services on the $136 million I-85/Yadkin River Roadway Improvement and Bridge Replacement DB project. The project includes widening 3.3 miles of I-85 from four lanes to eight lanes, noise walls, and structures (I-85 over the Yadkin River, NC Railroad, Duke Power Industrial Rail Spur, US 29/70 over Yadkin River, Wilcox Bridge, and new interchanges at I-85/NC 150 and I-85/Clark Road).
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.