KCA designed a site plan for rezoning and provided water, sewer, stormwater, paving, and drainage design services for this $1.5 million civil/site project to serve a new medical office in Tampa. Care was taken to preserve Grand Oak trees and provide adequate Americans with Disabilities Act (ADA) access to the building. Construction will be completed in mid-2015.
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.