KCA is responsible for obtaining a US Army Corps of Engineers, US Coast Guard Bridge Permit, Florida Department of Environmental Protection National Pollutant Discharge Elimination System permit, and Southwest Florida Water Management District Environmental Resources Permit for the construction of two new 3,500 feet bridge structures over the Manatee River, and associated improvements to three miles of roadway. Additionally included an assessment of the project area for the presence of federal and/or state listed protected species, determined wetland jurisdictional boundaries using federal and state guidelines, and provided a quantitative assessment of existing wetland values and wetland values lost using the Unified Mitigation Assessment Method (UMAM).
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.