FDOT District One recently selected our team to design a grade separation of SR 60 from the CSX Railroad in West Lake Wales (Polk County). SR 60 will be designed to span the CSX Railroad, Peace Creek canal, and an access road to adjacent property owners while avoiding conflicts with a gas transmission line—for a total of six bridges. As a major subconsultant to Faller Davis, KCA is providing structures design, authoring the bridge hydraulics report, and providing peer review of the plans, as well as constructability and bidability reviews.
Congrats to the proposal team including Tom Shaw, PE, and Ali Tayebnejad, PE.
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.