This project involves concrete rehabilitation and RRR improvements of SR 5 (US 1) from SR 207 to SR 16 and SR 16 to City Gates in St. Johns County. For this 3-mile, four-lane urban roadway, KCA will repair base problems, rehabilitate concrete pavement (6,000 concrete slabs to be evaluated), add paved shoulders, repair curb and gutters, repair ADA ramps, repair/replace damaged curb inlets, replace traffic signals for five intersections, and repair sidewalks. Additionally, the KCA team will provide traffic control plans, signing and pavement marking, traffic engineering, lighting, drainage design, GIS/data management, photogrammetry, mobile laser imaging, survey, SUE, geotechnical, and miscellaneous structures design services.
Congrats to the entire project team including John Burton, PE, PTOE, Project Manager/Concrete Rehabilitation; Paul Staes; Kevin Tasillo, PE, PTOE; Darren Brandes, PE; Tara Spieler, PE; David Hubert; Tony Filippello; Fathy Abdalla, Ph.D., PE, PTOE; and several others from KCA departments. A big thanks to all who helped with the preparation of this proposal and the marketing efforts that contributed to this win!
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.