Brevard County Win!
KCA Selected to Complete Design Criteria Package and Preliminary Plans for the Sea Ray Drive Bridge over Sykes Creek Repair Design-Build Project for Brevard County.
Read MoreKCA Selected to Complete Design Criteria Package and Preliminary Plans for the Sea Ray Drive Bridge over Sykes Creek Repair Design-Build Project for Brevard County.
Read MoreThe American Bridge Team was selected by FDOT District Seven for this Design-Build project! As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal Waterway Design-Build (D/B) project. This project involves […]
Read MoreKCA was awarded the Bay County Repairs to Deer Point Lake Dam (CR 2321 over Deer Point Lake) D/B Project! KCA, along with Contractor, Pneumatic Concrete CO, Inc., were recently awarded their first design-build (D/B) contract with Bay County, ranking a nearly 23-point spread over the […]
Read MorePinellas County selected the C&G/KCA Team for the Pinellas Trail Loop North Segment Design-Build project! The Cone and Graham (C&G)/KCA Team has been awarded Pinellas County’s $8 million Pinellas Trail Loop North Segment Design-Build (D/B) project. The team received the highest technical proposal and oral presentation […]
Read MoreThe Archer Western/deMoya BCC Team, in association with KCA, was selected for the Gateway Expressway Design-Build project! The Archer Western/deMoya BCC Team, in association with KCA, was the low bidder for FDOT District Seven’s $545 million Gateway Expressway Design-Build (D/B) project. The Team also received the […]
Read MoreThe Superior Construction/KCA Team was selected by FDOT District Three for the SR 85 Bridge Rehabilitation Design-Build project. This design-build project involves the rehabilitation of two bridges in Okaloosa County—SR 85 over Five Mile Bayou (1,056 feet, 16 spans) and SR 85 over Garniers Bayou (1,452 […]
Read More©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.