KCA Wins Roadway Design Contract in FDOT District Five!
KCA Wins Roadway Design Contract in FDOT District Five!
Read MoreKCA Wins Roadway Design Contract in FDOT District Five!
Read MoreThe Lochner Team (with KCA as a major sub) was selected by FDOT District One for the I-75 (SR 93) from East of SR 951 to SR 78 (Bayshore Drive) PD&E Study
Read MoreSR 21/Blanding Boulevard Add Lanes & Reconstruct (CR 220/ Road to Allie Murray Road); SR 21/Blanding Boulevard Add Lanes & Reconstruct (CR 218 to Black Creek)
Read MoreSR 55/US 19 Resurfacing; SR 49 Resurfacing; SR 49/US 129 Resurfacing; FDOT District Two!!
Read MoreKCA Nets First Roadway Design Win for FDOT District Six in more than 20 years!! KCA received great news on August 20 when it was selected by FDOT District Six to design the SR 5/S. Dixie Highway from N. of SW 336th Street to S. of […]
Read MoreKCA was selected by FDOT District Three for the Local Government Bridge Inspection and Scour Analysis Services contract! On June 4, KCA received good news after being selected for the Local Government Bridge Inspection and Scour Analysis Services contract for FDOT District Three. This win signifies […]
Read MoreFDOT District Two Constructability Review Contract Win! KCCS, Inc., received good news on June 18 after being selected for the Districtwide Constructability Review Contract for FDOT District Two. This win signifies the first-ever districtwide CEI contract win for KCCS in District Two and significantly solidifies the […]
Read MoreI-95 (SR 9) from SR 207 to International Golf Parkway (Resurfacing with Diverging Diamond Interchange at SR 16), FDOT District Two, St. Johns County, FL The TranSystems Team (with KCA as a major subconsultant) was selected by FDOT District Two for the I-95 (SR 9) from […]
Read MoreFDOT District One awarded the SR 70 PD&E Study to KCA! KCA was selected by FDOT District One for the Project Development and Environment (PD&E) Study of SR 70 from CR 29 to Lonesome Island Rd. in Highlands County. For this PD&E study, KCA will evaluate […]
Read MoreThe RK&K Team (with KCA as a major sub) was selected by FDOT District Seven for the US 41 at CSX Grade Separation S. of Causeway Boulevard project The RK&K Team (with KCA as a major sub) was selected by FDOT District Seven for the US […]
Read More©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.