KCA provided roadway and drainage design support for this project development and environment (PD&E) study. A safety and crash analysis was performed along with a conceptual ramp design and a Pond Siting Report. After the District received approval of the Interchange Operational Analysis Report (IOAR), KCA completed final design including a new two-lane exit ramp, ramp lighting, drainage improvements, and signal modifications. This project also consisted of widening and resurfacing the existing northbound off ramp. The widening provided dual right-turn lanes onto SR 222. Other features included MOT, S&PM, and drainage analysis and design.