This project involves widening a 3.6-mile-long segment of SR 528 from four to six lanes with the additional lanes being express lanes. The US 1 and SR 3 interchanges will be reconstructed as will the westbound bridge over the Indian River, and Indian River relief bridges. KCA will also design a shared-use trail from US 1 to SR 3, which will be part of the East Coast Greenway Trail. Additionally, the corridor will also accommodate improvements proposed by All Aboard Florida. KCA will assist with the PD&E re-evaluation for the proposed express lanes. The KCA Team will provide roadway and structures design, drainage/permitting, environmental, signing and pavement marking (S&PM)/traffic/signals, geotechnical/contamination, Intelligent Transportation Systems (ITS)/lighting, public involvement, utility coordination, surveying and mapping/subsurface utility engineering (SUE), landscape architecture, and architecture services.
©Copyright 2014-2021 Kisinger Campo & Associates. All rights reserved.