Skip to Content

A Legacy 50 Years in the Making: Happy Anniversary, KCA!

HomeProjects

2017 Feasibility Study Express Design LSC And 2019 And 2021 Feasibility Studies LSC

Owner: NCDOT
Location: Craven County, NC
Map highlighting road changes with labels "To Be Replaced" or "To Be Removed." Various street names visible: NE Highland Ave, N Liberty St, Woodland Ave NE, E 17th St, Harrit Turnman Dr
Concept Design
Map showing proposed road extensions and bridge replacement near HJ Macdonald Middle School. Key labels include "Extend C/A to College Ct," "Replace Bridge No. 240001," and "Extend C/A to Elizabeth Ave."
Concept Design
Roundabout design at intersection with streets labeled; includes Main St, Garnett St, North Williams St, Peach St, and Kittrell St
Concept Design
Highway intersection layout, showing roads Central Ave, National Blvd, Murphy Dr, with property labels and green spaces
Concept Design
Feasibility Study
Concept Design
Concept Design
Diamond Concept Design
Concept Design
Diamond Concept Design

Since 2017, KCA has completed approximately 25 Feasibility Studies (FS) and currently has three active FS projects with NCDOT. They are as follows:

H183917 – Modernization of US 64 from US 276 to Windsor Drive, Transylvania and Henderson Counties

H230721 – Orange Grove Road Widening in Orange County

H231407 – Glenburnie Road and Amhurst Blvd. intersection improvements in Craven County. KCA completed the review of upgrading US 52 to an interstate facility from just south of Clemonsville Road H090370 (U-2826) to the Winston-Salem northern beltway and then continuing to I-77 in Surry County (H090022). The H090370 and a portion of the H090022 studies were subsequently broken out into six separate studies which included (FS H184836, H190643, H190715, H190716, H190718, and H192270). In addition, KCA has previously completed a Feasibility Study to add an interchange at US 52 and Trinity Church Road (FS-111166) near the end of 2017.

Focus Areas

  • Roadway Design
  • Traffic Design

Recent Projects

Williams Road Southern Swale Analysis

Estero, FL

As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…

Williams Road Roundabout

Estero

KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…

SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)

Pinellas County, FL

As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…