Skip to Content

A Legacy 50 Years in the Making: Happy Anniversary, KCA!

HomeProjects

Projects

Every project we deliver tells a story of collaboration, innovation, and impact. At KCA, we take pride in designing and inspecting transportation infrastructure that improves how people move, connect, and thrive within communities.

Graham Swam Trail And Pedestrian Bridge Over SR 100, Flagler County, FL

Flagler County, FL

KCA was selected by Flagler County to design a multi-use trail through the Graham Swamp. This Local Agency Program (LAP)-funded project involved the design and…

Able Canal Multi-Use Trail LAP

Lehigh Acres, FL

This Local Agency Program (LAP)-funded project included the design and permitting of approximately 6 miles of shared-use path along the Able Canal in Lehigh Acres,…

B-5988 Burns Street Bridge Replacement- NCDOT Division 10 LAP Oversight Contract, Town of Wadesboro, NC

Town of Wadesboro, NC

KCA was tasked with providing contract administration (CA) services, including construction engineering and inspection (CEI) and materials inspections, for the construction of the Burns Street…

I-3802A, Widening of I-85 from North of NC 73 to North of Lane Street, NCDOT Division 10-Cabarrus/Rowan Counties, NC

Cabarrus/Rowan Counties, NC

KCA provided Lead Technicians and multiple support staff under Statewide On-Call contracts for this $107.9 million design-build (D/B) project that widened I-85 from four to…

Replace Three Bridges on Service Road Inside Dominion Energy Plant within Cope Energy Generation Plant, Cope, SC

Cope, South Carolina

Full service bridge replacement project including roadway, hydrology/hydraulics, stream/wetland delineation, and structure design. This project was complicated due to the lack of existing hydraulic modeling,…

NCDOT Low-Impact Bridge Replacements – Statewide – Federal Funding

North Carolina

Over the last ten years, KCA has planned and designed over 30 Division bridge projects. These projects consist of pre-construction activities for planning, natural and…

Build Grant (Statewide) Bridge Replacements, NCDOT, Structures Management Unit (SMU) – Multiple Divisions

North Carolina

KCA was selected for various NCDOT Better Utilizing Investments to Leverage Development (BUILD) Grant Bridge Replacement projects. Our work tasks have included all aspects including…

NCDOT Ongoing General Engineering Services Contract (GESC) Tasks: Hydraulics, Alternative Delivery-Divisions 1,2,4,10, and 11

North Carolina

KCA has worked as a GESC in Divisions 1, 4, and 11 over the past three years and was more recently selected to work as…

2017 Feasibility Study Express Design LSC And 2019 And 2021 Feasibility Studies LSC

Craven County, NC

Since 2017, KCA has completed approximately 25 Feasibility Studies (FS) and currently has three active FS projects with NCDOT. They are as follows: H183917 –…

Trusted by the Best in Transportation

A testament to KCA’s quality and dedication, more than 90% of our work comes from repeat clients, including state DOTs, cities, counties, and transportation agencies across the Southeast. We value these relationships (whether long-standing, newly formed, or actively developing) and remain committed to delivering exceptional service, trusted collaboration, and proven results on every project.