Skip to Content

A Legacy 50 Years in the Making: Happy Anniversary, KCA!

HomeProjects

Projects

Every project we deliver tells a story of collaboration, innovation, and impact. At KCA, we take pride in designing and inspecting transportation infrastructure that improves how people move, connect, and thrive within communities.

Duke Energy Inspections and Asset Management

NC, SC, IN, KY

Since 2017, KCA has provided bridge inspection, preservation, and asset management services for all rail and road bridges in Duke Energy’s coal and hydro divisions…

NW Cary Parkway over Black Creek and Black Creek Greenway-Bridge Rehabilitation

Cary, NC

This project consisted of rehabilitation of a bridge in need of repairs to place this Town structure onto the State maintenance system. KCA provided turn-key…

Chain of Lakes Trail Pedestrian Bridge over Avenue T/SR 544

Winter Haven, FL

The Chain of Lakes Trail is a multi-use path that stretches along a 3.6 mile corridor from downtown Winter Haven to US Highway 17/92 in…

60th Avenue East; Buffalo Road; and Intersection Reconstruction at 69th Street East and Mendoza Road

Manatee County, FL

KCA was selected by Manatee County to provide design services for roadway reconstruction along the undivided 60th Avenue East corridor and the extension of Buffalo…

I-75 (SR 93) from Sumter Boulevard to North River Road

Sarasota County, FL

This 9.3-mile interstate project included the widening of the existing four-lane I-75 roadway to an interim six-lane section with provisions for the ultimate eight-lane typical.…

I-75 (SR 93) from Pasco/Hernando County Line to North of SR 50 (US 98)

Hernando County, FL

This project consisted of widening 9.09 miles along I-75 from the Pasco/Hernando County line to north of SR 50 (Cortez Boulevard) in Hernando County. The…

Max Brewer Bridge Replacement over the Indian River

Brevard County, FL

The A. Max Brewer Bridge Replacement is a continuous high-level, Category 2, fixed-span bridge over the Indian River, which replaced a low-level swing-span bridge located…

I-4/I-275 Downtown Tampa Interchange

Hillsborough County, FL

The I-4/I-275 DTI was originally designed in the early 1960s to accommodate 60,000 vehicles per day. Today’s traffic is nearly three times that capacity, necessitating…

George Bean Parkway Widening and Return to Terminal Recirculation Bridge

Tampa International Airport

This project included the design and construction of the widening of the George Bean Parkway to provide an additional lane into and out of Tampa…

Trusted by the Best in Transportation

A testament to KCA’s quality and dedication, more than 90% of our work comes from repeat clients, including state DOTs, cities, counties, and transportation agencies across the Southeast. We value these relationships (whether long-standing, newly formed, or actively developing) and remain committed to delivering exceptional service, trusted collaboration, and proven results on every project.