Every project we deliver tells a story of collaboration, innovation, and impact. At KCA, we take pride in designing and inspecting transportation infrastructure that improves how people move, connect, and thrive within communities.

Able Canal Multi-Use Trail LAP

Lehigh Acres, FL

This Local Agency Program (LAP)-funded project included the design and permitting of approximately 6 miles of shared-use path along the Able Canal in Lehigh Acres,…

Replace Three Bridges on Service Road Inside Dominion Energy Plant within Cope Energy Generation Plant, Cope, SC

Cope, South Carolina

Full service bridge replacement project including roadway, hydrology/hydraulics, stream/wetland delineation, and structure design. This project was complicated due to the lack of existing hydraulic modeling,…

NCDOT Low-Impact Bridge Replacements – Statewide – Federal Funding

North Carolina

Over the last ten years, KCA has planned and designed over 30 Division bridge projects. These projects consist of pre-construction activities for planning, natural and…

Build Grant (Statewide) Bridge Replacements, NCDOT, Structures Management Unit (SMU) – Multiple Divisions

North Carolina

KCA was selected for various NCDOT Better Utilizing Investments to Leverage Development (BUILD) Grant Bridge Replacement projects. Our work tasks have included all aspects including…

2017 Feasibility Study Express Design LSC And 2019 And 2021 Feasibility Studies LSC

Craven County, NC

Since 2017, KCA has completed approximately 25 Feasibility Studies (FS) and currently has three active FS projects with NCDOT. They are as follows: H183917 –…

U-6157: Modernization of Cajah Mountain Road (SR 1130) from Connelly Springs Road to US 321-A, Caldwell County, NC

Caldwell County, NC

This 3.4-mile roadway modernization project consists of improving multimodal connectivity in a rural town setting by adding bike lanes, sidewalks, and a multi-use path in…

Sanibel Causeway Emergency Repairs Phased Design-Build (PDB)

Lee County, FL

In the aftermath of Hurricane Ian, the Sanibel Causeway sustained damage to such an extent that it was impassible by land. The two islands that…

I-5719C (CMGC)/U-5800 Design-Build Bridge Package Preparation, NCDOT Division 12, Gaston County, NC

Gaston County, NC

In 2023, KCA was engaged by NCDOT’s Structure’s Management Unit (SMU) and the Alternative Delivery Unit to provide preservation plans for bridge 350143 in Gaston…

Governor’s Recovery Office of Western NC/NC Emergency Management – Private Road & Bridge Program, Various Counties

Western North Carolina

KCA was one of the nine firms selected by the NC Department of Public Safety Division of Emergency Management (NCEM) to provide engineering support to…

Trusted by the Best in Transportation

A testament to KCA’s quality and dedication, more than 90% of our work comes from repeat clients, including state DOTs, cities, counties, and transportation agencies across Florida, Texas, and the Carolinas. We value these relationships (whether long-standing, newly formed, or actively developing) and remain committed to delivering exceptional service, trusted collaboration, and proven results on every project.