Skip to Content

A Legacy 50 Years in the Making: Happy Anniversary, KCA!

HomeProjects

Projects

Every project we deliver tells a story of collaboration, innovation, and impact. At KCA, we take pride in designing and inspecting transportation infrastructure that improves how people move, connect, and thrive within communities.

Tanglewood/Bayou Grande Bridge Replacement

St Petersburg, FL

This project consisted of the replacement of the existing Tanglewood Bridge servicing Bayou Grande Boulevard northeast over Tanglewood Canal in Pinellas County, FL. The 67-year-old…

Williams Road from US 41 to Via Coconut Point

Lee County, FL

KCA is providing professional consultant services to study Williams Road from US 41 to Via Coconut Point to identify future widening needs. Williams Road from…

US 41 at CSX Grade Separation S. of Causeway Boulevard

Hillsborough County, FL

As a major subconsultant responsible for roadway and structures design, KCA was selected by FDOT District Seven for the US 41 at CSX Grade Separation…

SR 50 Bypass from Broad Street to Jefferson Street

Hernando County, FL

The project involved adding lanes and rehabilitating the existing pavement for SR 50/Cortez Boulevard in Hernando County. SR 50 from Broad Street to Jefferson Street…

Maydell Drive Bridge Replacement

Tampa, FL

This Hillsborough County/FDOT District Seven Local Agency Program (LAP) project consisted of replacing the existing 616-foot bridge, reconstructing the roadway approaches, and providing pedestrian connectivity.…

60th Avenue East; Buffalo Road; and Intersection Reconstruction at 69th Street East and Mendoza Road

Manatee County, FL

KCA was selected by Manatee County to provide design services for roadway reconstruction along the undivided 60th Avenue East corridor and the extension of Buffalo…

I-75 (SR 93) from Sumter Boulevard to North River Road

Sarasota County, FL

This 9.3-mile interstate project included the widening of the existing four-lane I-75 roadway to an interim six-lane section with provisions for the ultimate eight-lane typical.…

I-75 (SR 93) from Pasco/Hernando County Line to North of SR 50 (US 98)

Hernando County, FL

This project consisted of widening 9.09 miles along I-75 from the Pasco/Hernando County line to north of SR 50 (Cortez Boulevard) in Hernando County. The…

I-4/I-275 Downtown Tampa Interchange

Hillsborough County, FL

The I-4/I-275 DTI was originally designed in the early 1960s to accommodate 60,000 vehicles per day. Today’s traffic is nearly three times that capacity, necessitating…

Trusted by the Best in Transportation

A testament to KCA’s quality and dedication, more than 90% of our work comes from repeat clients, including state DOTs, cities, counties, and transportation agencies across Florida, Texas, and the Carolinas. We value these relationships (whether long-standing, newly formed, or actively developing) and remain committed to delivering exceptional service, trusted collaboration, and proven results on every project.