HomeProjects
Projects
Every project we deliver tells a story of collaboration, innovation, and impact. At KCA, we take pride in designing and inspecting transportation infrastructure that improves how people move, connect, and thrive within communities.
George Bean Parkway Widening and Return to Terminal Recirculation Bridge
Tampa International Airport
This project included the design and construction of the widening of the George Bean Parkway to provide an additional lane into and out of Tampa…
CR 54 (Wesley Chapel Boulevard) from N. of SR 56 to N. of Magnolia Boulevard
Pasco County, FL
This project will widen CR 54 from a two-lane undivided rural roadway to a six-lane divided urban section from approximately 0.5 mile north of SR…
Ortiz Avenue Widening from SR 884 (Colonial Boulevard) to SR 82 (Dr. Martin Luther King Jr. Boulevard)
Lee County, FL
KCA is providing design and permitting services for improvements to Ortiz Avenue from Colonial Boulevard (SR 884) to SR 82 (Dr. Martin Luther King Jr.…
North Ridge Trail Rd. PD&E and Design
Polk County, FL
KCA has been tasked with designing the new North Ridge Trail Road and overpass over I-4 in Polk County. The scope includes design of new…
PD&E Group 22-1 (SR 20)
Washington and Bay Counties, FL
The purpose of the SR 20 project was to improve hurricane evacuation capacity and provide an enhanced regional east-west corridor. The limits extend from SR…
Big Carlos Pass PD&E Study and Final Design
Lee County, FL
KCA was selected to lead the PD&E study and design for the Big Carlos Pass Bridge replacement. The existing bridge over the Big Carlos Pass…
SR 5 (US 17) from Broward River to Nassau County Line
Nassau County, FL
The scope of this project includes resurfacing, restoration, and rehabilitation (RRR) and safety improvements from north of the Broward River Bridge (MP 0.716) to just…
SR 429 Widening & Systemwide Flex Lanes
Orange County, FL
CFX selected KCA to perform design services for the widening of SR 429 (Tilden Road to Florida’s Turnpike). This project is the southern component of…
Pinellas Trail Loop North Segment Design-Build (D/B)
Pinellas County, FL
The $8 million Pinellas Trail Loop is a vital link throughout Pinellas County and the surrounding roadway network as part of the emerging Southwest Coast…
Trusted by the Best in Transportation
A testament to KCA’s quality and dedication, more than 90% of our work comes from repeat clients, including state DOTs, cities, counties, and transportation agencies across Florida, Texas, and the Carolinas. We value these relationships (whether long-standing, newly formed, or actively developing) and remain committed to delivering exceptional service, trusted collaboration, and proven results on every project.