KCA provided Lead Technicians and multiple support staff under Statewide On-Call contracts for this $107.9 million design-build (D/B) project that widened I-85 from four to eight lanes with concrete pavement. The NC 152/I-85 interchange has a new bridge over I-85 and two new ramps constructed on the north side, NC 152 widened, and three roundabouts were constructed. NC 152 has new bridges over US 29 and the North Carolina Railroad. Daugherty, Lentz and Pine Ridge Roads have new bridges over I-85. A new interchange was constructed at Old Beatty Ford Road, which included a new bridge over I-85 and a ramp bridge.
Focus Areas
- Roadway Design
- Bridge Replacement
- CEI
Recent Projects
Williams Road Southern Swale Analysis
Estero, FL
As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…
Williams Road Roundabout
Estero
KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…
SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)
Pinellas County, FL
As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…