Ortiz Avenue Widening from SR 884 (Colonial Boulevard) to SR 82 (Dr. Martin Luther King Jr. Boulevard)
KCA is providing design and permitting services for improvements to Ortiz Avenue from Colonial Boulevard (SR 884) to SR 82 (Dr. Martin Luther King Jr. Boulevard), a 1.7-mile urban arterial corridor. The project includes preparing construction plans, permits, and specifications to widen the existing two-lane roadway to a four-lane facility, with consideration for future expansion to six lanes based on traffic analysis. Improvements include maintaining the existing multi-use path on the west side, adding a 5-foot sidewalk on the east side, providing on-street bicycle facilities on both sides, and designing roadway transitions near SR 884, SR 82, and the Hanson Street roundabout. The scope also includes coordination and design for the relocation of existing Lee County utilities.
Focus Areas
- Roadway Design
- Traffic Engineering
- Hydraulics Design
- Structures Design
- Environmental Services
- CEI