Skip to Content

A Legacy 50 Years in the Making: Happy Anniversary, KCA!

HomeProjects

Pinellas Trail Loop North Segment Design-Build (D/B)

Owner: Pinellas County
Location: Pinellas County, FL
Aerial view of Pinellas County Trail with cyclists, flanked by residential areas and baseball fields
Pinellas County Trail
Aerial view of Pinellas County Trail, baseball fields, and nearby residential area
Pinellas County Trail
Aerial view of intersection, parking lot, and surrounding residential area in Pinellas County
Pinellas County Trail
Aerial view of a residential neighborhood featuring a central trail with surrounding houses and trees
Pinellas County Trail
Aerial view of highway intersection, buildings, and green spaces; logo reads "Aerial Innovations" with a bird graphic
Pinellas County Trail
Aerial view of a residential area with homes, a pond, and a multi-lane road with traffic
Pinellas County Trail
Aerial view of Pinellas County Trail crossing over a highway surrounded by dense green forest
Pinellas County Trail
Aerial view of a wide intersection with multiple lanes, adjacent trail, forested area, and adjacent Walgreens store
Pinellas County Trail
Aerial view of a multi-lane intersection with vehicles, near a river and grassy area
Pinellas County Trail
Aerial view of suburban neighborhood with tree-lined streets and houses
Pinellas County Trail

The $8 million Pinellas Trail Loop is a vital link throughout Pinellas County and the surrounding roadway network as part of the emerging Southwest Coast Regional Trail. This 75-mile loop will ultimately provide regional connectivity as the longest continuous trail in Florida for a cross-state connection to the planned Coast to Coast Trail. The ultimate vision for the trail network is one which provides multi-modal accommodations for pedestrians/bicyclists creating the foundation for non-motorized travel throughout Pinellas County while interconnecting other networks. Currently, the 75-mile planned loop requires approximately 21.35 miles of trail construction for loop completion. The North Segment project focused on constructing the northernmost gap within the Pinellas Trail Loop beginning south of Enterprise Road and connecting to the Duke Energy Trail. This segment of trail runs approximately 6.5 miles to the north utilizing a large portion of the Duke Energy easement and terminates north above the Lake Tarpon Outfall connecting the southernmost trailhead at John Chestnut Park. KCA provided roadway and structures design, drainage, traffic/signing and pavement markings (S&PM)/signalization, and environmental/permitting services for this project.

Focus Areas

  • Roadway Design
  • Structures Design
  • Hydraulics Design
  • Traffic Engineering
  • PD&E

Recent Projects

Williams Road Southern Swale Analysis

Estero, FL

As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…

Williams Road Roundabout

Estero

KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…

SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)

Pinellas County, FL

As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…