SR 528 from East of SR 524 (Industry Road) to East of SR 3
This project involved reconstruction of a 3.6-mile-long segment of SR 528 from four to six lanes with the additional lanes being express lanes. The US 1 and SR 3 interchanges will be reconstructed as will the westbound bridge over the Indian River, and Indian River relief bridges. KCA also designed a shared-use trail from US 1 to SR 3, which will be part of the East Coast Greenway Trail. Additionally, the corridor will also accommodate improvements proposed by All Aboard Florida. KCA assisted with the project development and environmental (PD&E) re-evaluation for the proposed express lanes. The KCA Team provides roadway and structures design, drainage/permitting, environmental, signing and pavement marking (S&PM)/traffic/signals, geotechnical/contamination, Intelligent Transportation Systems (ITS)/lighting, public involvement, utility coordination, surveying and mapping/subsurface utility engineering (SUE), landscape architecture, and architecture services.
Focus Areas
- Structures Design
- PD&E
- Environmental Services
- Traffic Engineering