TBNext Segment 2: I-275 (SR93) from North of I-375/5th Avenue N. to North of 38th Avenue North
Segment 2 of Tampa Bay Next (TBNext) [I-275 from north of I-375/5th Avenue N. to north of 38th Avenue N.] is an Urban Principal Arterial Interstate with three interchanges and 11 bridges. This project’s improvements include the addition of express lanes in the median of I-275, operational and lane continuity improvements, rigid pavement rehabilitation, Regional Rapid Transit (RRT) accommodations, and noise wall construction. In addition, KCA is evaluating and addressing safety issues (i.e., hydroplaning and wrong way detection [WWD]), providing a comprehensive temporary traffic control plan (TTCP), permitting, and maintaining current bridge clearances are all essential requirements.
Focus Areas
- Structures Design
- Roadway Design
- Safety Improvements
Recent Projects
Williams Road Southern Swale Analysis
Estero, FL
As part of the Willliams Road Improvements, KCA is assisting with drainage and stormwater analysis and maintenance of the southern swale along Williams Road from…
Williams Road Roundabout
Estero
KCA was selected by the Village of Estero to provide design and permitting services for the roadway and intersection improvements along Williams Road at Atlantic…
SR 679 (Pinellas Bayway) Structure E over Intracoastal Waterway, Design-Build (D/B)
Pinellas County, FL
As a partner to American Bridge Company and American Consulting Professionals, KCA was selected for the SR 679 (Pinellas Bayway) Structure E over the Intracoastal…